Certification Courses and Exam Details
| Course Title | Lessons | Quizzes |
Phase Tests |
Project Required |
Cert. Exam Attempts | Questions |
Pass Score |
Time Limit |
Pass Rate** |
Sat. Rating* | PDU |
Earned Designation |
Avg. Completion |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| CSSBB | $995 | 21 | 21 | 5 | Yes | 2 | 150 | 80% | 3Hrs. | 98.2% | 95.6% | 35 | CSSBB | 51 Days |
| CSSBB Exam | $450 | No | 2 | 150 | 80% | 3Hrs. | 98.2% | 95.6% | 0 | CSSBB | 141 Min. | |||
| CSSGB | $795 | 17 | 17 | 5 | No | 2 | 100 | 80% | 2Hrs. | 96.9% | 93.0% | 25 | CSSGB | 54 Days |
| CSSGB Exam Only | $350 | No | 2 | 100 | 80% | 2Hrs. | 96.9% | 93.0% | 0 | CSSGB | 118 Min. | |||
| CSSYB | $595 | 11 | 11 | 3 | No | 2 | 50 | 80% | 1Hr. | 91.7% | 98.7% | 15 | CSSYB | 27 Days |
| CSSYB Exam Only | $250 | No | 2 | 50 | 80% | 1Hr. | 91.7% | 98.7% | 0 | CSSYB | 48 Min. |
Statistical Software is Not Required For the Above Courses or Exams | Course Supported Statistical Software Versions: Minitab v.22, SigmaXL v.11, JMP v.19. | Each course version will be available in your account upon enrollment | Designation keys: LSS = Lean Six Sigma | SS = Six Sigma | BB = Black Belt | GB = Green Belt | YB = Yellow Belt | PDU = Professional Development Units | **Pass Rate: (#Passes/#Exams) for the Period 1/1/25 - 12/12/25; Unique Students | *Satisfaction Rating: (#Satisfied / #Responses) for the Period 1/1/23 - 12/12/25
Body of Knowledge
Lean Six Sigma Black Belt Body of Knowledge for "Certified Six Sigma Black Belt" (CSSBB).
-
Define Phase
Overview of Six Sigma
Six Sigma Fundamentals
Lean Six Sigma Projects
Lean Fundamentals
Define Phase Test
-
Measure Phase
Process Definition
Six Sigma Statistics
Measurement Systems
Process Capability
Measure Phase Test
-
Analyze Phase
Patterns of Variation
Inferential Statistics
Hypothesis Testing
Hyp. Tests Normal
Hyp. Tests Non-Normal
Analyze Phase Test
-
Improve Phase
Simple Linear Regression
Multiple Regression
Design of Experiment
Full Factorial DOE
Fractional Factorial DOE
Improve Phase Test
-
Control Phase
Statistical Process Control
Six Sigma Control Plans
Lean Controls
Control Phase Test
Certification Exam
-
Define Phase
-
Overview of Six Sigma
What is Six Sigma
Six Sigma History
Y=f(x) Approach
Six Sigma Methodology
Roles & Responsibilities -
Six Sigma Fundamentals
Defining a Process
VOC & CTQ's
QFD
Cost of Poor Quality
Pareto Analysis -
Lean Six Sigma Projects
Six Sigma Metrics
Rolled Throughput Yield
Business Case & Charter
Project Team Selection
Project Risk Management
Project Planning -
Lean Fundamentals
Lean and Six Sigma
History of Lean
Seven Deadly Muda
Five-S (5S)
Define Phase Test
-
Measure Phase
-
Process Definition
Cause & Effect Diagram
Cause & Effect Matrix
Process Mapping
FMEA
Theory of Constraints -
Six Sigma Statistics
Basic Statistics
Descriptive Statistics
Distributions & Normality
Graphical Analysis -
MSA
Precision & Accuracy
Bias, Linearity & Stability
Gage R&R
Variable & Attribute MSA -
Process Capability
Capability Analysis
Concept of Stability
Attribute vs Discrete
Monitoring Techniques
Measure Phase Test
-
Analyze Phase
-
Patterns of Variation
Multi-Vari Analysis
Classes of Distributions -
Inferential Statistics
Understanding Inference
Sampling Techniques
Sample Size
Central Limit Theorem -
Hypothesis Testing
Hypothesis Testing
Statistical Significance
Risk; Alpha & Beta
Types of Hypothesis Tests -
Hyp. Tests Normal
1-sample t-test
2-Sample t-test
Paired t-test
1-sample variance
One Way ANOVA -
Hyp. Tests Non-Normal
Mann-Whitney
Moods Median
Kruskal-Wallis / Friedman
1 Sample Sign & Wilcoxon
1 & 2 Sample Proportions
Chi-Squared
Test of Equal Variances
Analyze Phase Test
-
Improve Phase
-
Simple Linear Reg.
Correlation
X-Y Diagram
Regression Equations
Residuals Analysis -
Multiple Regression
Non-Linear Reg.
Multiple Linear Reg.
Confidence Intervals
Residuals Analysis
Box-Cox Transformation
Stepwise Regression
Logistic Regression -
Design of Experiment
Experiment Objectives
Experimental Methods
DOE Design Considerations -
Full Factorial DOE
2k Full Factorial Designs
Linear & Quadratic Models
Orthogonal Designs
Fit, Model & Center Points -
Fractional Factorial DOE
Fractional Designs
Confounding Effects
Experimental Resolution
Improve Phase Test
-
Control Phase
-
SPC
Data Collection for SPC
Individuals Charts
Xbar Charts
Proportions Charts
CumSum, EWMA Charts
Control Chart Anatomy
Subgroups & Sampling
Control Limits -
Lean Controls
Control Methods for 5S
Kanban
Poka-Yoke -
Six Sigma Control Plans
Cost Benefit Analysis
Control Plan Elements
Response Plan Elements
Control Phase Test -
Certification Exam
